The bath, basin, wc and furniture have been removed along with the tiles and flooring. A new shower room is then installed with a large walk in shower tray and a hinged glass panel allowing access into the showering area. The walls were then fully tiled and karndean fitted to the floor.
BEFORE
![](https://www.alanheathandsons.co.uk/wp-content/uploads/2022/11/case-study-bath-to-shower_before-03.jpg)
![](https://www.alanheathandsons.co.uk/wp-content/uploads/2022/11/case-study-bath-to-shower_before-02.jpg)
![](https://www.alanheathandsons.co.uk/wp-content/uploads/2022/11/case-study-bath-to-shower_before-01.jpg)
AFTER
![](https://www.alanheathandsons.co.uk/wp-content/uploads/2022/11/case-study-bath-to-shower_after-03.jpg)
![](https://www.alanheathandsons.co.uk/wp-content/uploads/2022/11/case-study-bath-to-shower_after-02.jpg)
![](https://www.alanheathandsons.co.uk/wp-content/uploads/2022/11/case-study-bath-to-shower_after-01.jpg)